Setting up our first (SNAP)SHOTS!

It's crunch time now! This week we made a lot of great progress and now have a more concrete plan for the rest of the semester. Here is our manufacturing schedule for the yolaroid!

Yolaroid Manufacturing Schedule for this last week and the upcoming week

Our biggest achievement this week is we made our first molds in lab! It took us a while to figure out how to use the mill but doing our first bit of machining together was a great learning experience. It didn't take us too long with the staff to start familiarizing ourselves with the mill and our first molds for the Yolaroid body came out really well! Maybe by the end of the semester we will be just as one with the machine as Joe!

First Yolaroid molds!

For lab this week, we are ready to begin injection molding the Yolaroid body as a team. Working as a team to walk through machining the molds as well as injection molding will allow us to split up some work for making the other molds and injection molding pieces for the rest of the semester. In preparation for this week's lab, we also went ahead and finished making edits to the CADs of each piece, CADing the molds for the top and bottom camera pieces, and some of the CAM for each piece. For this week's lab, we are ready to begin injection molding the body and can go ahead and begin machining the molds for the top camera piece. We also plan on getting in our 3D print for the thermoform die out of the way and begin experimenting with printing and thinking about the jig we might need to make.


We're excited to start injection molding and taking our first (SNAP)SHOTS of the Yolaroid! 

Comments

Post a Comment

Popular posts from this blog

Getting in focus

This week, we made many changes to our design for manufacturing and design-related reasons. We finished machining 3 of the 4 molds for injection molding, created a plan for the design of our magnetic photo piece, printed on plastic and successfully thermoformed the camera lens, and tested injection molding for two of our pieces (including checking the snap fit on the pegs). Things seem to be in good shape! Check out our progress sheet here .  Machining At this point, machining hurdles are somewhat expected — but it seemed like we ran into many this week! The CAM for the camera front pieces (both top and bottom) proved difficult for two main reasons: (1) For the camera bottom piece, it was nearly impossible to generate a tool path that successfully removed enough material for the snap fit of our very small magnet. After trying horizontals, pencils, and several other finishing paths, we finally found the settings to sufficiently clean up the magnet hole (with a scallop, fol

Capturing Our Desired Design

Over the past couple weeks, we’ve experienced some machining set-backs, but we have successfully machined all of our molds (except the photo mold, which will be machined today in class!). We have created our first assembled yoyo, which can be seen in the picture at the right . One of the issues that we had was that we accidentally machined our holes too large for our dowel pins, so we had to remachine the cores of the top and bottom camera piece with a smaller diameter. We then had to ream our holes and press fit in our dowel pins. We learned that the difference between what should work in paper and what does in real life is significant: our holes needed to fit 5/64” pins, but we ended up only reaming to .076” because the holes were too large the previous time. This time they fit perfectly, which was super satisfying for our team. Previously, we had used Loctite, which had super inconsistent results - one of our dowel pins fell into the mold and the other one broke right off. We al